Project:
Wentworth Golf Club
Client:
Garenne Interiors
Specification:
Internal Decorations
Project Duration:
4 Months
Value:
200,000.00

Client required a 6-8-week turnaround from complete closure to completion, to enable the BMW Open not to be affected in any way.

The main banqueting hall ceiling required extensive works to completely change its appearance from a rough sawn timber to a smooth opaque finish blending into the interior designers finishing scheme.  The rest of the building was extensively remodelled leaving us with a very tight finishing period, after facilitating  24 hour working multi shifts practical completion was achieved on time.

The extensive use of fabric wallcoverings was referred to as stunning by the designer and client alike.